Construction

U.S. ARMY CORPS OF ENGINEERS
CONSTRUCT USMC MEDLOG FACILITY
CHARLESTON, SC
Charelston

Accura provided construction and construction management of a new 1,540 square foot pre-engineered metal building and upfit of an existing 9,780 square foot US Marines Reserves Center, which included selective demolition, relocation of existing plumbing and fire sprinkler heads, construction of fire rated interior partitions and fire alarm system. The scope included installation of a vertical storage carousel and two new HVAC units.

 

FEDERAL BUREAU OF PRISONS
RENOVATE WATER SYSTEM
Guaynabo, Puerto RicoPuerto Rico

This design and construction project will allow for the long-term viability of the water support system at the Metropolitan Detention Center (MDC) in Guaynabo, PR. The project will be conducted in three phases; installation of two new water tanks to function as the potable water source and the refurbishment and repair of the existing one water tank as the dedicated fire protection source