Construction Services

Georgia Department of Transportation & State Road and Tollway AuthorityGA Express Lanes

Georgia Express Lanes Northwest Corridor

Accura is providing construction engineering and inspection and materials testing support for the multi-year road construction project in northwest Georgia. The Northwest Corridor project is designed to improve travel in the I-75/I-575 corridor by adding 29.7 miles of toll lanes along I-75 from Akers Mill Rd to Hickory Grove Road and along I-575 from I-75 to Sixes Road along with express lanes. Project involves construction of new bridges, roadways, MSE walls and sound barriers.

 

U.S. ARMY CORPS OF ENGINEERS
CONSTRUCT USMC MEDLOG FACILITY
CHARLESTON, SC
Charelston

Accura provided construction and construction management of a new 1,540 square foot pre-engineered metal building and upfit of an existing 9,780 square foot US Marines Reserves Center, which included selective demolition, relocation of existing plumbing and fire sprinkler heads, construction of fire rated interior partitions and fire alarm system. The scope included installation of a vertical storage carousel and two new HVAC units.

 

FEDERAL BUREAU OF PRISONS
RENOVATE WATER SYSTEM
Guaynabo, Puerto RicoPuerto Rico

This design and construction project will allow for the long-term viability of the water support system at the Metropolitan Detention Center (MDC) in Guaynabo, PR. The project will be conducted in three phases; installation of two new water tanks to function as the potable water source and the refurbishment and repair of the existing one water tank as the dedicated fire protection source

 

 

GENERAL SERVICES ADMINISTRATION
Construction Management/Project Management (Region 4)region 4

Accura is providing Construction Management as Agent services at the Hiram Ward Federal Building Courthouse in Winston-Salem, North Carolina as a part of its GSA Public Buildings BPA. This project entails modernization, renovation and repairs for the following:   

  • Elevator Modernization
  • Exterior Plaza Renovations and Repairs to the Parking Structure
  • Veterans Benefits Administration (VBA) Renovations
  • United States District Court Renovations

 

U.S. ARMY CORPS OF ENGINEERS
MARTIN ARMY HOSPITAL
FORT BENNING, GAfort benning

Accura provided Construction QA MEP inspections for the new Martin Army Community Hospital. The 745,000-square foot hospital and clinic complex consists of an eight-story hospital building, 2 multi-story clinic buildings and 2 parking garages.  This Design-Build $333 million-dollar project was completed in 2014. Accura’s scope included inspection and review of HVAC, plumbing, fire suppression, transportation (elevators and pneumatic tubes), medical gas and robotics.