Wastewater Treatment Plant and Environmental Campus

Located in Fulton County, Johns Creek is a new state-of-the-art wastewater treatment facility. The facility is designed for a treatment capacity of 15MGD and includes support structures such as high rate clarifiers, UV odor control facilities, equipment maintenance and administration buildings, among others.

ACCURA provided geotechnical engineering and materials testing support for the project including subsurface exploration, subgrade testing, inspections and evaluations including soil fill placement testing and inspections, more than 400 auger cast-in-place piles, foundation inspections, pavement/asphalt evaluations, masonry testing, concrete testing and laboratory testing.